rumors ...

A rumor is currently spreading in the hospital – new building soon. It had been rumor, smoke screen for the past few years. The management had talked over and over about having a new building.


Our current hospital construction consists of 3 building. Two 3 storey buildings and One 8 storey building. All of the building had aged more than 20 years. The settings is currently inconsistent with the new requirement. However the management had kept telling the evaluation board that the plan of building new construction was undergoing then. This would be their last call… so a plan had to be on the way. The original plan was to build a new hospital not far away. Unfortunately part of the land fell within the urban country planning zone and the local authority had asked for a big “rebate” in exchange for the approval of building the new hospital. The rebate was inacceptable – indoor and out door recreation park for the local… and one of the shitty rule was hospital staff cannot parked in front of the indoor building. Most of us were against the plan though as the hospital would be 2 times bigger but as we were unable to get any more new staff – building a hospital might ended up with losing our job.


Now the new plan is to demolished the two 3 storey building and build a bigger 4 level building. Why 4 instead of 8 ? The answer is simple – building a 4 level building (plus G floor of coz) doest not need much approval. [there is a army artillery unit around our area and, we need to get approval from the Ministry of Defense to build something taller.] . Our boss had bought one of the house back of our hospital allowing the new building to building beyond our boundary.


The 1st move is to build a temporary ( for 1 -2 years) building in our parking lot – the ED, office and registration would shift into it. Then the old building would be demolished and the construction would begin then. It would take 1+ years.


Hopefully we could survive….